ENERGY AUGMENTATION - A SCIENCE READY TO SERVE HUMANITY WITH STRONG THEORETICAL BACKINGS

POWER-POTS AUGMENTING ENERGY TO REIGN IN THE POWER SECTORS OF THE WORLD.

Home
THE SYNPYROL ELECTRIC POWER
GEO-ASTRAL ELECTRICITY FOR POWER STARVED STATES: INDIA-BIHAR/ABROAD
HUGE ELECTRICAL POWER PRODUCTION CAN GENERATE VERY HIGH CARBON CREDITS
POWER SCENARIO IN INDIA
THE GROUND & ASTRAL ENERGY FOR HUMANITY !
THE STAR WAR IN VIRTUAL POWER LAB
GEO/ASTRAL-MEGA POWER PRODUCTION PLANT
PERPETUAL AC~ENERGY REPRODUCTION DEVICE TO REIGN IN THE POWER SECTORS OF THE WORLD.
POWER-POTS AUGMENTING ENERGY TO REIGN IN THE POWER SECTORS OF THE WORLD.
COMMENTS OF INTERNATIONAL AUTHORITIES IN BRIEF
THE SPACE CONTRACTION
THE ENERGY CONTRACTION
THE TIME CONTRACTION
THE TIME [MANUFACTURING] MACHINE
THE TIME SPACE VISION
WE ARE 'TIME-SPACE' TRAVELLER: A JOURNEY TO THE VIRTUAL WORLD !
AUTOACCELERATED ENERGY RELEASE FOR ADDITIONAL ENERGY GENERATION
MANAGE YOUR ENERGY GENERATION AND CONSUMPTION
ROLE OF FEACKSOLe IN THE NATIONAL PETROLEUM FUEL CRISIS SOLUTION
VIRTUAL ENERGY [Ve] DEVICE CONVERTS REAL ENERGY [Re] INTO VIRTUAL ENERGY GEN-SET.
OVER 3000 MW GEO-ASTRAL POWER GENERATION PLANT
CO-POWER INTEGRATION
MINIMUM TEN TIMES AC~ ENERGY MULTIPLICATION/AUGMENTATION
SINGLE PHASE AC~ ENERGY SOURCE AUGMENTATION FOR DOMESTIC-COMMERCIAL USAGE
SINGLE PHASE AC~ ENERGY SOURCE AUGMENTATION FOR COOKING AND LIGHTING SIMULTNEUSLY
MODERN ELECTRIC POWER SUBSTITUTION BY A SINGLE PHASE GEO-AC~ENERGY GEN-POT
METHANOL TO REPLACE PETROLEUM FUEL FOR HEATING WATER TO BE USED FOR COMMUNITY SERVICES
ETHANOL TO REPLACE EIGHTY PERCENT PETROL
FURFURAL MIX TO REPLACE DIESEL/HSDO PETROLEUM FUEL
BIO-ENERGY AUGMENTATION ESSENTIAL FOR CELL DIVISION
ENERGY AUGMENTATION HAS BEEN WELL PERCIEVED IN MODERN, ANCIENT AND YOGIC SCIENCES
Contact Us

POWER-POTS

MINIMUM FOUR KINDS OF POWER-POTS CAN BE HAD TO AUGMENT ELECTRIC ENERGY TO MEET ELECTRIC REQUIREMENTS OF THE HUMAN POPULATION:

A)    POWER-GENE-POT,

B)     COMMERCIAL POWER-POT,

C)    INDUSTRIAL POWER-POT AND

D)    GRID POWER-POT.

THE POWER-GENE-POT /A PERPETUAL AC~POWER GENERATOR: IT IS TO MEET ALL PURPOSES’ ELECTRIC ENERGY REQUIREMENTS NEEDED IN ANY HOUSE HOLD/DOMESTIC LEVEL-FOR  LIGHTING, HEATING, COOLING, DOMESTIC AND KITCHEN APPLIENCES’ OPERATIONS, COOKING HOT-PLATES etc  WHERE MOSTLY ROUTINELY SINGLE PHASE AC~ 220/240 VOLT POWER IS USED.
IT IS TO BE INSTALLED AFTER CENTRALLY DISTRIBUTTED ENERGY CONSUMPTION RECORDING METER. IT FUNCTIONS IN PRESENCE OR IN ABSENCE OF THE CENTRALLY DISTRIBUTTED ELECTRIC POWER.
PO

WER CONSUMPTION CONSCIOUS CONSUMERS CAN KEEP FOR MONTHS TOGATHER SWITCHED OFF THE POWER CONNECTING MAINS’ SUPPLY TO GET TARIFF FREE ENERGY MEETING REQUIREMENTS.

THE POWER-GENE-POT ONCE FULLY PRIMED / CHARGED CAN FUNCTION FOR VERY-VERY LONG PERIOD WITHOUT FURTHER POWER RECHARGING. IT CONTAIN AUTO RECHARGING DC-POWER BATTERY BACKING. THE ONLY PRECONDITION IS THAT IT SHOULD BE PROVIDED STRONG GROUNDING CONTACT.

MOST SUITABLE SET OF A POWER-GENE-POT HAS BEEN DESIGNED TO WITH STAND CONTINEOUS AC~ POWER LOADING OF 10000 WTTS. WHERE THERE IS CONSTANT REQUIREMENT OF OVER 10KVA POWER LOAD, A NUMBER OF SUCH SETS CAN BE INSTALLED IN PARALLEL.

THIS POWER-GENE-POT CAN BE USED FOR DECENTRALISED RURAL ELECTRIFICATIONS. FOR WHICH PROPER GROUNDING BE PROVIDED FOR EACH SET, AND A PREPRIMED POWER-GENE-POT BE INSTALLED ADOPTING ALL THE ELECTRIC POWER SAFETY RULES FOR CONSUMERS. FOR ANY RECHARGING/REPOWER PRIMING NEED A POWER RECHARGING STATION WITH TRAINED EMPLOYS AND DG-SET BE KEPT READY BY THE GRAM-PANCHAYAT PUBLIC SERVICE-SECTION. IN CASE THE POWER-GENE-POT SET GETS DIFUNCT IT SHOULD BE REPLACE BY A NEW SET ONLY.

 

COMMERCIAL POWER-POT:- IT IS TO ENHANCE VOLTAGE DURING PICK POWER CONSUMPTION HOURS OR WHERE LOW VOLTAGE POWER SUPPLY IS IN PREVAILANCE. WHERE EVER, THE POWER SUPPLY REMAINS ADEQUATE THE COMMERCIAL POWER-POT ENSURES 20 TO 50% POWER CONSUMPTION REDUCTION. MOSTLY IT COMES TO 33.33% POWER CONSUMPTION REDUCTION, AND 50% POWER AUGMENTATION WITH HIGHLY IMPROVED POWER CONDUCTIVITY THROUGH THE POWER LOAD APPLIANCES ATTACHED THERE WITH, AND IT ADEQUATELY IMPROVES POWER FACTOR.

THIS EQUIPMENT IS RECOMMENDED TO BE USED WHERE THERE IS SINGLE OR TWO PHASE OR THREE PHASE AC~ POWER SUPPLY MEETING DOMESTIC OR COMMERCIAL INDUSTRIAL  POWER REQUIREMENTS.

IT IS INSTALLED AFTER THE CENTRALLY SUPPLIED POWER/ENERGY CONSUMPTION RECORDING ENERGY SOURCE OR ENERGY METER. IT’S FUNCTIONAL AND OR POWER LOAD BEARING CAPACITY CAN BE DESIGNED OF REQUIRED CAPACITY FROM 10KVA AND ABOVE. IT SCARCELY NEEDS ANY POST SALE SERVICE CARES.

THIS BIHARI-SIR DEVICE CAN ALSO BE CALLED 'INSTANT POWER GENERATOR OR ADDITIONAL POWER GENERATOR' TO SAVE ONE THIRD POWER TARIFF, AND TO GENERATE 50% ADDITIONAL POWER. SAY, IF A NATION HAS 105000 MW AC~ POWER, UNDER THE EFFECT OF THIS ADD ENERGY GEN POT ONLY 70000 MW POWER WILL BE REPLACING THE POWER LOAD OF THE 105000MW. THERE BY 35000 MW SURPLUS AC~ POWER WILL NOW REMAIN IN HAND FOR FURTHER DIS POSAL/WORK LOAD DEPLOYMENT. NOW THROUGH THE ABOVE DEVICE THIS 35000 MW AC~ POWER WILL REPLACE THE POWER LOAD REQUIREMENT WORTH 52500 MW. THIS IS MOST SUTAIBLE DEVICE TO SOLVE NATIONAL POWER CRISIS INSTANTLY, WITH ONE THIRD POWER TARIFF REDUCTION TO ALL CONSUMERS!

 If this add energy device is fabricated and installed on the power grid network the power production can be augmented minimum two folds. In this case tremendous amount of plant installation cost, recurrent coal and labour cost will not be required. Flue ash and other types of additional pollution will  be escaped. NATION WILL BE RELIEVED FROM GRIEVOUS PULLUTANTS LIKE 20 TONS ASH, 2 TONS SULPHERDIOXIDE FOR EVERY 100 MW POWER AUGMENTATION/HOUR. MORE OVER ON EACH 100 MW POWER AUGMENTATION/HOUR NATION WILL ALSO SAVE 60 TONS COAL, 26200 TONS AIR, 25510 TONS WATER AND 500 ACRES VALUABLE LAND. There are many other benefits of having power augmentation of this nature. India Govt or any other Government should appreciate its application.

INDUSTRIAL POWER-POT:  IT IS TO SAVE AND AUGMENT FUNCTIONAL POWER OUT-PUT OF THREE PHASE AC~ POWER DRIVEN MOTORS. UNDER ITS EFFECTS X-HP AC~ MOTOR CAN PERFORM POWER LOAD BEARING WORK OF MINIMUM 2X-HP MOTOR. WHILE PERFORMING POWER LOAD BEARING WORK OF 2 X-HP THE ENERGY CONSUMPTION RECORDING ENERGY METER WILL SHOW POWER CONSUMPTION OF X-HP ONLY. THIS POWER- POT ENSURES AUGMENTED FUNCTIONAL OUT-PUT OF AC~ POWER DRIVEN MOTORS EVEN AT LOW VOLTAGE POWER INPUT AT AS LOW AS 300 VOLTS. THIS POWER-POT CAN ALSO BE POWERED BY DG-SET TO GET AT LEAST TWO FOLD POWER AUGMENTATION WITHOUT ANY INCREASE IN FUEL CONSUMPTION BY THE DG-SET DEPLOYED THERE WITH.

DEPLOYMENTS OF THIS INDUSTRIAL POWER-POT ENSURES EFFECTS OF HIGHIER VOLTAGE, FREQUENCY, POWER CONDUCTIVITY AND HIGHIER POWER FACTOR ENABLING AUGMENTED POWER OUT-PUT FROM ANY AC~POWER DRIVEN MOTOR ATTACHED THERE WITH.

THE INDUSTRIAL POWER-POT IS SUGGESTED TO DEPLOY IN FUNCTION JUST BEFORE AC~ POWER DRIVEN MOTORS TO AUGMENT ITS FUNCTIONAL POWER OUT-PUT.

 

GRID POWER-POT: THIS POWER-POT IS TO BE ATTACHED IN PARALLEL TO A POWER GRID OF ONE MEGA WATT 11KV CAPACITY TO AUGMENT AC~ POWER TO ONE PLUS FOUR MEGA WATTS.

THIS POWER-POT WORKS ONLY IN PRESENCE OF ADEQUATE (11KV ONE MEGA WATT) POWER AVAILABLITY IN THE POWER GRID. THE AVAILABLE POWER IN THE POWER GRID KEEPS ON POWER PRIMING TO THIS POWER-POT.WHICH ENSURES FOUR FOLDS POWER GENERATION BY THE PARALLELLY ATTACHED POWER-POT NET-WORK. ANOTHER PRECONDITION REQUIRED IS TO MAKE AVAILABLE ADEQUATE POWER GROUNDING TO THIS POWER-POT.

IT IS STRONGLY RECOMMENDED TO WITH DRAW THIS AUGMENTED FOUR MEGA WATTS POWER THROUGH 440 VOLTAGE SECONDARY TRANSFORMER NET-WORKS ONLY.

THIS PROCESS OF POWER AUGMENTATION DOES NOT CAUSE ANY POWER LOSS FROM THE PRIMARY 11KV POWER GRID. NOT MORE THAN FOUR FOLDS POWER AUGMENTATION IS RECOMMENDED FROM ONE MEGA WATT POWER SOURCING TRANSFORMER. IF THE POWER SOURCING 11KV TRANSFORMERS ARE OF MORE THAN ONE MEGAWATT SUPPLY THEN ACCORDINGLY POWER AUGMENTATION CAN BE ENHANCED IN THE RATIO OF 1:4 ONLY.

IT IS POSTULATED IF ANY STATE OF A NATION HAS GOT AC~ POWER RESOURCE OF 2000 MW, THE STATE CAN HAVE 10000MW POWER BY USING THIS POWER AUGMENTATION TECHNOLOGY OF THE ‘BIHAR SIR- SCIENCE AND TECHNOLOGY’. THE BEAUTY OF THIS TECHNOLOGY IS TO GET ADDITIONAL POWER GENERATION WITHOUT PUTTING ANY RECURRENT ENERGY BACKING / IN PUT. IT ASKS FOR ONE TIME INVESTMENTS ONLY.

APPLICATION OF THE BIHARI-SIR AC~ELECTRICITY AUGMENTATION TECHNOLOGY IN SERIES IS MORE BENEFICIAL, AND SIX TIMES POWER AUGMENTATION CAN BE HAD. IT IS MUCH MORE NEED MEETING TECHNOLOGY FOR INDIA, WHICH NEEDS MINIMUM FIVE TIMES ADDITIONAL POWER PRODUCTION WITHIN 20-25 YEARS, WHICH LOOKS TO BE IMPOSSIBLE.ESTIMATED HYDRO-THERMAL ELECTRIC POWER AVAILABLE FOR 60% PUBLIC CONSUMPTION IS 151000MW WITH 30.5% T/D-LOSSES.THERE BY POWER AT CONSUMERS' DOORS COMES TO BE ONLY 105000MW. THIS ESTIMATION IS OF 2009/2010Yr. BY NOW MINIMUM NEED OF POWER GOES FOR 210000MW. FOR PRODUCING ADDITIONAL 105000MW OR ABOVE ALL EFFORTS ARE IN PROGRESS. BY THE TIME THIS EFFORT COULD BE REALISED IT WOULD BE 2040Yr, AND THE PUBLIC NEED WILL INCREASE MANY FOLDS, SAY FOR 630000MW WITH T/D-LOSSES IT WILL BE 9O7000MW.TO HAVE GENERATED 630000MW REAL POWER AFTER T/D LOSSES THE NATION WILL NEED IN RECURRENT CONSUMPTION OF 45000 MILLIONS MT COAL PER YEAR, 3300 CRORES CUSECS WATER PER YEAR, ESTIMATED PLANT COST WILL BE ABOVE Rs 55 LAKHS CRORES AND MANY MORE. 

HENCE FORETH, 'BIHARI-SIR' SCIENCE & TECHNOLOGY IMPLIMENTATION MAY PROVE TO BE MORE ECONOMIC AND LESS TIME CONSUMING.THERE IS EVERY POSSIBILITY OF AUGMENTING PRESENTLY AVAILABLE 105000MW POWER BY SIX FOLDS TO HAVE 630000MW BY USING BIHARI-SIR SCIENCE & TECHNOLOGY I.e. TO ADD TO IT 525000MW POWER. THIS CAN BE DONE COMPARATIVELY IN SHORTER PERIOD THAN ESTABLISHING PLANTS AND PRODUCING MORE THAN 9 LAKHS MW POWER.MORE OVER IT WILL SAVE 100% COAL AND WATER, NO CARBON DIOXIDE & FLUE ASH EMISSION WILL TAKE PLACE. ONLY ONE TIME POWER AUGMENTATION EQUIPPMENTS INSTALLATIONS AT DIFFERENT PLACES OF DIFFERENT CAPACITIES AND PHASES WILL BE REQUIRED.NO RECURRENT CONSUMPTION EXCEPT CONSTANT QUALITY POWER AVAILABILITY OF THAT 105000MW WOULD BE REQUIRED.

 

design.jpg