OVER 3000 MW GEO-ASTRAL POWER GENERATION PLANT.
INTRODUCTION:
MODERN ELECTRICITY
GENERATION PLANTS ARE ENERGY CONSUMPTION BACKED EITHER OF CONVENTIONAL OR NON-CONVENTIONAL ENERGY SOURCES. WELL KNOWN MEGA
POWER GENERATION PLANTS ARE HYDROELECTRIC, THERMAL AND NUCLEAR. MODERN SOCIETY IS GETTING POWER SUPPLY UNDER CENTRALISED POWER
DISTRIBUTION SYSTEM BASICALLY FROM THESE THREE ENERGY SOURCES. FUTURE OF ALL THESE THREE ENERGY SOURCES ARE NOT VERY MUCH
FAIR. DAYS ARE NOT AWAY WHEN THESE TYPES OF POWER GENERATION PLANTS SHALL BE HAVING ONLY A POWER PRIMING/POWER SYNCRONIZING
OR HISTORICAL STATUS.
PRESENT ERA IS DEMANDING
FOR 100% CLEAN NON-CONVENTIONAL MEGA POWER GENERATION PLANTS.AMONG MANY OF THEM – SOLAR, WIND, TIDES AND BIOENERGY SOURCES
ARE PROMISING. BUT THESE ARE INCAPABLE OF REPLACING CONVENTIONAL MEGA POWER GENERATION ENERGY SOURCES AS STATED ABOVE. CONCEPTION
OF A MEGA POWER GENERATION PLANT FROM A VERY UNPOPULAR NON-CONVENTIONAL SOURCE: GEO-ASTRAL 100% CLEAN ENERGY GENERATION PLANT,
HAS NOT YET BEEN CONCEIVED EITHER BY ANY PRIVATE OR PUBLIC SECTOR.. BUT ITS HISTORY OF AVAILABILITY IN DIFFERENT WAYS AND
MODES CAN BE TRACED SINCE 1980 [THE TRIBUNE, CHANDIGARH], 1986 [ THE BIO-ENERGY SOCIETY OF INDIA] AND 2005 [IN THE INTERNATIONAL
SCIENTIFIC JOURNALS/ MAGAZINES OF ‘ASSOCIATION OF INTERNATIONAL SCIENTISTS’-AIS].MOREOVER MANY DETAILS AND DESCRIPTIONS
ARE ALREADY AVAILABLE ON THE WEBSITE; drmallikaugmentsenergy.tripod.com, and feacksole.tripod.com.
OUT OF PRESENT INDIAN
NATIONAL MINIMUM POWER DEMAND OF 212000 MW ONLY 182344 MW INSTALLED ELECTRIC POWER GENERATION CAPACITY IS AVAILABLE. 55% OF
WHICH IS COAL BURNT THERMAL ELECTRICITY. OUT OF WHICH ONLY 58% POWER PRODUCTION IS POSSIBLE TO BE EXPORTED TO THE POWER GRIDS
FOR DISTRIBUTION AND CONSUMPTION. THE ELECTRIC POWER GENERATION AND DISTRIBUTION SCENARIO IN BIHAR
IS STILL POOR. AGAINST 5000 MW [APPX] PEAK POWER LOAD DEMAND ONLY 900 MW TO 1333 MW [APPX] PEAK POWER LOAD DEMAND IS MET.MOREOVER,
THE PRESENT INSTALLED ELECTRIC POWER GENERATION AND SUPPLY CAPACITY IN BIHAR IS ONLY 1846 MW [APPX].
CONSIDERING EVEN 73% POWER PLANT LOAD FACTOR BIHAR REQUIRES POWER GENERATION INSTALLED CAPACITY OF
THE VALUE OF 9000 MW [APPX].THUS ‘THE NEED AND AVAILABILITY’ OF INSTALLED POWER GENERATION GAP IS VERY HIGH. WHICH
COMES TO 1: 5 OR 20% POWER AVAILABILITY ONLY.
THE REASON FOR SUCH
A POOR ELECTRICITY GENERATION INSTALLED CAPACITY IN BIHAR IS UNAVAILABILITY OF ‘POWER GENERATION
BACKING ENERGY SOURCES: WATER FOR HYDROELECTRICITY AND COAL FOR THERMAL ELECTRICITY. NEVER THE LESS, 75% POWER IN BIHAR IS
GENERATED OR RECEIVED AS THERMAL ELECTRICITY, 20% AS HYDROELECTRICITY AND 5% ELECTRIC ENERGY IS MADE AVAILABLE FROM ‘REMAINING
ENERGY SOURCES’.
AVAILABILITY OF WATER
AND COAL SOURCES FOR POWER GENERATION IN BIHAR IS TURNING INTO A REMOTE DREAM AS THESE SOURCES ARE
BECOMING MATTER OF GREAT SCARCE. THE R.E.S./ NON-CONVENTIONAL SOURCES IN USE ARE NOT CAPABLE OF MEETING EVEN 5% OF THE PEAK
POWER LOAD DEMAND OF THE STATE- BIHAR.
AT PRESENT ‘THE INSTALLED POWER GENERATION CAPACITY AND POWER SUPPLY MANAGEMENT GAP’ TO MEET PEAK POWER
LOAD DEMAND IN BIHAR IS OF 600 MW [APPX]. USING OUR ‘’ART OF GEO-ASTRAL 100% CLEAN POWER GENERATION TECHNOLOGY’ WE WOULD
LIKE TO PRODUCE GEO-ASTRAL ELECTRICITY AND SUPPLY OVER 3000 MW PER HOUR WITHOUT ANY POWER BACKING - INPUT BUT SYNCHRONIZED
WITH 33KV POWER GRID .
SINCE THE PLANT LOAD
FACTOR OF OUR GEO-ASTRAL ENERGY TECHNOLOGY IS CLOSED TO 100% FROM THIS OVER 3000 MW POWER REAL EFFECTIVE OUT PUT WILL REMAIN
CLOSED TO 100%. HENCE, THIS NATURE OF MEGA POWER GEO-ASTRAL 100% CLEAN ENERGY GENERATION PLANT WILL BE BROUGHT INTO PRACTICE
FOR THE FIRST TIME IN THE WORLD, WE ARE TO TAKE IT AS ‘VENTURE PILOT’ PRODUCTION PLANT AT AN ESTIMATED COST OF Rs 15 (FIFTEEN) CRORES AND ABOVE PER MEGA WATT. ANY NEXT SUCH GEO-ASTRAL 100% CLEAN
ELECTRICITY GENERATION PLANT COULD BE MORE ECONOMIC AND HIGHLY COST EFFECTIVE.
FROM THE ABOVE QUANTA
OF ELECTRICITY WE ARE INTENDED TO SUPPLY A FEW MW POWER TO THE NEAR BY AREA / VILLAGES ON HIGHLY ECONOMIC RATE FOR THEIR PROSPERITY.
ONLY ABOIT 0.6 MW POWER WILL BE USED BY OUR PLANT WORK-SHOP.REMAINING POWER WILL BE EXPORTED TO BIHAR STATE/CENTRAL ELECTRICITY
BOARD’S THROUGH THE SAME 33KV POWER GRID. THUS OUR STATE CAN BE GETTING UNINTTEREPTED 100% CLEAN POWER SUPPLY FROM
OUR PLANT TO THE VALUE OF REQUIRED MW/ YEAR. THIS POWER SUPPLY TO THE STATE ELECTRICITY BOARD WOULD BE PROVIDED UNDER ‘MERCHANT
POWER TRADING SCHEME' OF THE CENTRAL GOVT ELECTRICITY ACTS.
TECHNOLOGY
SINCE THE GEO-ENERGY
IS OF MONODIRECTIONAL SINISTERAL FLOW IN NATURE TO THE VALUE OF 8.25 KW PER UNIT OF THE NEGATIVE GRAVITATIONAL ENERGY SOURCE,
TO CONVERT IT INTO DEXTRAL DIRECTIONAL FLOW POWER SYNCHRONIZATION OF AC~ NATURE IS REQUIRED. FOR THIS PURPOSE DIRECT 11 Kv
AC~ ENERGY POWER FROMTHE 33Kv POWER GRID IS DEPLOYED INTO POWER PRIMING / SYNCHRONIZATION ACTION, THIS QUANTA OF POWER USED
FOR POWER PRIMING/SYNCHRONIZATION WOULD BE KEPT ON RETURNING BACK TO THE POWER FEEDERS/GRID.
ONCE AC~ POWER PRIMING
/SYNCHRONIZATION IS MADE AVAILABLE MULTIPLE PROVISIONS ARE ENSURED TO ACHIEVE SMOOTH GEO-ASTRAL ENERGY GENERATION BY THE PERPETUAL
GEO-ASTRAL POWER GENERATION DEVICE. FOR THIS PURPOSE ASTRAL AND GEO ENERGY COLLECTION NETWORKS ARE INTRODUCED IN 11Kv AC~
POWER LINES, WHERE IN FOR ASTRAL AND GEOENERGY NETWORKS STAR BINDING TRANSFORMER LIKE EQUIPPMENTS ARE USED. WHICH ARE AS FOLLOWS.AC~
DEXTRAL POWER IS ALLOWED TO MULTIPLY WITH SINESTERAL GEO/ASTRAL ENERGY CONFRONTING WITH ITS CONTACT; SINISTERAL POWER REDRESSING
BY ‘PRO-ANTI’ MAGNETIC FLUXES FOR POWER FLOW MANUPULATION; SUPPER CONDUCTION IN THE AC~ LOOPS IS INDUCED BY THE
VIRTUAL ENERGY EXCITEMENT TO WITH HOLD ENHANCED POWER LOAD; AND THE INITIAL AC~ POWER RESOURCE IS AUGMENTED SEVERAL FOLDS.
MINIMUM FOR SIX HOURS
AC~ POWER SYNCHRONIZED AND PRIMED GEO/ASTRAL-GEN-DEVICE WITH ALL ABOVE DESCRIBED PROVISIONS IS ALLOWED TO RUN TO GENERATE
AC~ ELECTRICITY OF DESIRED FREQUENCY, VOLTAGE WITH SMOOTHEN PLANT FUNCTION. PERFECTION OF THE GEO/ASTRAL-GEN-DEVICE ASSEBLAGE
AND QUALITY POWER OUT PUT IS REVERIFIED AND REENSURED.EARTHING / GROUNDING, INSULATION, SATISFACTORY FUNCTIONING OF JOINTS,
SWITCHES AND ALL KINDS OF OPERATIONAL SAFTY MEASURES ARE REENSURED. ONCE THE AC~ POWER OF 11Kv AND 50 Hz IN A POLLUTION CONTROLLED
SURROUNDINGS HAS TO COME INTO PROPER ACTION, GRADUALLY POWER LOAD IS DEPLOYED UPON AT 440 VOLT THROUGH 11000 VOLT NET WORKS.THIS
IS OF VERY COSTLY AND HIGHLY SKILLED WORK-PERFORMANCE. ONCE EVERY THING, AS DESCRIBED ABOVE, IS PROPERLY AVAILABLE THE POWER
SUPPLY SYSTEM IS ALLOWED TO BE VERIFIED BY THE POWER PROCURING AGENCY, AND AFTER GETTING NOC /NO OBJECTION CERTIFICATES THE
POWER SUPPLY/EXPORTING SERVICES ARE BROUGHT INTO ACTION FOR DISTRIBUTION AND PUBLIC CONSUMPTION.
NUMEROUS TRANSFORMER
LIKE HEAVY DUTY STRUCTURES ARE CONSTITUENT PARTS OF THE PERPETUAL GEO/ASTRAL-GEN-DEVICE. THEY ARE WELL INSULATED THICK FIBRE
SHEET COVERED DRIED AIR/OIL COOLED DEVICES OF DIFFERENT SPECIFICATIONS HEAVY DUTY IDENTITIES. SUCH PERPETUAL GEO/ASTRAL-GEN-POT/DEVICE
INSTALLED IN A WAY AND MODE TO HAVE MAXIMUM VIVRATION FREE ERECTION ON HEAVILY STRONG INSULATED CIVIL STRUCTURES.FURTHER THE
GEO/ASTRAL-GENENERATION DEVICE IS ATTACHED DIRECTLY TO 33000 VOLT OIL COOLED TRANSFORMERS BY WELL KNOWN TECHNOLOGY. THE NEAR
BY SUBRURAL POPULATION/ RURAL MASSES AND THE PLANT WORK-SHOP GET POWER AT 440 VOLT CONVERTED FROM 11000 VOLT SYNCHRONIZATION
NETWORKS. SUCH POWER GENERATION PLANTS SHOULD NOT BE OF SMALL POWER GENERATION CAPACITY, SAY 100 TO 150 MW.
DEVICES AND IMPLIMENTS
TWO SETS (POWER SYNCHRONIZATION
SET AND POWER AUGMENTATION SET) THREE GROUPS OF HEAVY DUTY FUNCTIONING ‘DEVICES AND IMPLIMENTS’ ARE DEPLOYED TO
GENERATE DESIRED QUALITY AND QUANTUM OF GEO/ASTRAL AC~ ELECTRICITY. THEY CONSIST OF A] POWER PRIMING /SYNCHRONIZING DEVICES
AND IMPLIMENTS B] GEO/ASTRAL-GEN-POT DEVICES AND IMPLIMENTS, AND C] HIGH VOLTAGE
AC~ ELECTRIC ENERGY EXPORTING DEVICES AND IMPLIMENTS FOR ATTACHING TO 33kv POWER GRID/DISTRIBUTION NET WORKS.
THE POWER PRIMING
/SYNCHRONIZATION DEVICES AND IMPLIMENTS IN ANY ISOLATED PROJECT ARE PERPETUALGEO- POWER GENERATION PLANT. INSTALLATION, AND
DEMO RUNNING AT PRESCRIBED POWER LOAD ON TURN-KEY BASIS
WORK WILL BE PROVIDED BY THE EQUIPMENT MANUFACTURES AND SUPPLYERS. –’
IF BSEB PERMITS 5
TO 10 TIMES AUGMENTATION OF POWER CAN BE MADE DIRECTLY UPON ITS 11kv/440VOLT POWER DISTRIBUTION GRID. HENCE, SUCH GEOGENERATION
POWER UNITS, WHICH GENERATES AC~POWER IN MW DIRECTLY FROM THE EARTH ARE SUITABLE ALSO FOR POWER TO BE EXPORTED AWAY &
AHEAD FROM THE FEEDER GRID TO ‘END POINT POWER GENERATION AND SUPPLY NET-WORKS’. THIS MODE OF GEO-GEN-SETS ARE
HIGHLY CREDITED FOR DISTRIBUTION AND SUPPLY OF POWER AHEAD FROM THE TERMINAL POINT OF THE SEB-POWER GRID WITH ALMOST WATTLESS POWER EXISTENCE.THUS IT IS VERY SUITABLE FOR SUBRURAL/RURAL/AGRICULTURE NEED
BASED POWER SUPPLY.IN ADDITION TO THE ABOVE IT IS ALSO POLLUTION AND CARBON DIOXID EMISSION FREE.
THE GEO-GEN-POT/DEVICE
IS PROPRIETORY 'DEVICES AND IMPLIMENTS'. THEY ARE MANUFACTURED, SUPPLIED, INSTALLED AND OPERATED ONLY BY THE EXPERTS
OF ITS INVENTOR GROUPS. DEPENDING ON AC~ POWER GENERATION QUANTUM CAPACITY, VOLTAGE AND THE FREQUENCY INPUT THE MODIFICATION
COST DOES NOT VARY SUBSTANCIALLY AND AT PRESENT THE ESTIMATED COST IS Rs 15.00 [FIFTEEN] CRORES/MW ONLY WITH TURN KEY SERVICES
BASIS.
ALL DEVICES
AND IMPLIMENTS ARE THOSE USED REGULARLY FOR TRANSPORTING AC~ POWER FROM ONE POINT TO OTHER POINTS. WHICH ARE PROCURED AT MARKET
PRICE RATE AS PER REQUIREMENTS FOLLOWING STANDARD TRANSFORMATION TECHNOLOGY APPLICATIONS SUITABLE FOR POWER IN MWs EXPORTING AT 440 VOLT, 11000 VOLT AND 33000 VOLT ONLY.