ENERGY AUGMENTATION - A SCIENCE READY TO SERVE HUMANITY WITH STRONG THEORETICAL BACKINGS

OVER 3000 MW GEO-ASTRAL POWER GENERATION PLANT

Home
THE SYNPYROL ELECTRIC POWER
GEO-ASTRAL ELECTRICITY FOR POWER STARVED STATES: INDIA-BIHAR/ABROAD
HUGE ELECTRICAL POWER PRODUCTION CAN GENERATE VERY HIGH CARBON CREDITS
POWER SCENARIO IN INDIA
THE GROUND & ASTRAL ENERGY FOR HUMANITY !
THE STAR WAR IN VIRTUAL POWER LAB
GEO/ASTRAL-MEGA POWER PRODUCTION PLANT
PERPETUAL AC~ENERGY REPRODUCTION DEVICE TO REIGN IN THE POWER SECTORS OF THE WORLD.
POWER-POTS AUGMENTING ENERGY TO REIGN IN THE POWER SECTORS OF THE WORLD.
COMMENTS OF INTERNATIONAL AUTHORITIES IN BRIEF
THE SPACE CONTRACTION
THE ENERGY CONTRACTION
THE TIME CONTRACTION
THE TIME [MANUFACTURING] MACHINE
THE TIME SPACE VISION
WE ARE 'TIME-SPACE' TRAVELLER: A JOURNEY TO THE VIRTUAL WORLD !
AUTOACCELERATED ENERGY RELEASE FOR ADDITIONAL ENERGY GENERATION
MANAGE YOUR ENERGY GENERATION AND CONSUMPTION
ROLE OF FEACKSOLe IN THE NATIONAL PETROLEUM FUEL CRISIS SOLUTION
VIRTUAL ENERGY [Ve] DEVICE CONVERTS REAL ENERGY [Re] INTO VIRTUAL ENERGY GEN-SET.
OVER 3000 MW GEO-ASTRAL POWER GENERATION PLANT
CO-POWER INTEGRATION
MINIMUM TEN TIMES AC~ ENERGY MULTIPLICATION/AUGMENTATION
SINGLE PHASE AC~ ENERGY SOURCE AUGMENTATION FOR DOMESTIC-COMMERCIAL USAGE
SINGLE PHASE AC~ ENERGY SOURCE AUGMENTATION FOR COOKING AND LIGHTING SIMULTNEUSLY
MODERN ELECTRIC POWER SUBSTITUTION BY A SINGLE PHASE GEO-AC~ENERGY GEN-POT
METHANOL TO REPLACE PETROLEUM FUEL FOR HEATING WATER TO BE USED FOR COMMUNITY SERVICES
ETHANOL TO REPLACE EIGHTY PERCENT PETROL
FURFURAL MIX TO REPLACE DIESEL/HSDO PETROLEUM FUEL
BIO-ENERGY AUGMENTATION ESSENTIAL FOR CELL DIVISION
ENERGY AUGMENTATION HAS BEEN WELL PERCIEVED IN MODERN, ANCIENT AND YOGIC SCIENCES
Contact Us

OVER 3000 MW GEO-ASTRAL POWER GENERATION PLANT.  

 

INTRODUCTION:

 

MODERN ELECTRICITY GENERATION PLANTS ARE ENERGY CONSUMPTION BACKED EITHER OF CONVENTIONAL OR NON-CONVENTIONAL ENERGY SOURCES. WELL KNOWN MEGA POWER GENERATION PLANTS ARE HYDROELECTRIC, THERMAL AND NUCLEAR. MODERN SOCIETY IS GETTING POWER SUPPLY UNDER CENTRALISED POWER DISTRIBUTION SYSTEM BASICALLY FROM THESE THREE ENERGY SOURCES. FUTURE OF ALL THESE THREE ENERGY SOURCES ARE NOT VERY MUCH FAIR. DAYS ARE NOT AWAY WHEN THESE TYPES OF POWER GENERATION PLANTS SHALL BE HAVING ONLY A POWER PRIMING/POWER SYNCRONIZING OR HISTORICAL STATUS.

PRESENT ERA IS DEMANDING FOR 100% CLEAN NON-CONVENTIONAL MEGA POWER GENERATION PLANTS.AMONG MANY OF THEM – SOLAR, WIND, TIDES AND BIOENERGY SOURCES ARE PROMISING. BUT THESE ARE INCAPABLE OF REPLACING CONVENTIONAL MEGA POWER GENERATION ENERGY SOURCES AS STATED ABOVE. CONCEPTION OF A MEGA POWER GENERATION PLANT FROM A VERY UNPOPULAR NON-CONVENTIONAL SOURCE: GEO-ASTRAL 100% CLEAN ENERGY GENERATION PLANT, HAS NOT YET BEEN CONCEIVED EITHER BY ANY PRIVATE OR PUBLIC SECTOR.. BUT ITS HISTORY OF AVAILABILITY IN DIFFERENT WAYS AND MODES CAN BE TRACED SINCE 1980 [THE TRIBUNE, CHANDIGARH], 1986 [ THE BIO-ENERGY SOCIETY OF INDIA] AND 2005 [IN THE INTERNATIONAL SCIENTIFIC JOURNALS/ MAGAZINES OF ‘ASSOCIATION OF INTERNATIONAL SCIENTISTS’-AIS].MOREOVER MANY DETAILS AND DESCRIPTIONS ARE ALREADY AVAILABLE ON THE WEBSITE; drmallikaugmentsenergy.tripod.com, and feacksole.tripod.com.

OUT OF PRESENT INDIAN NATIONAL MINIMUM POWER DEMAND OF 212000 MW ONLY 182344 MW INSTALLED ELECTRIC POWER GENERATION CAPACITY IS AVAILABLE. 55% OF WHICH IS COAL BURNT THERMAL ELECTRICITY. OUT OF WHICH ONLY 58% POWER PRODUCTION IS POSSIBLE TO BE EXPORTED TO THE POWER GRIDS FOR DISTRIBUTION AND CONSUMPTION. THE ELECTRIC POWER GENERATION AND DISTRIBUTION SCENARIO IN BIHAR IS STILL POOR. AGAINST 5000 MW [APPX] PEAK POWER LOAD DEMAND ONLY 900 MW TO 1333 MW [APPX] PEAK POWER LOAD DEMAND IS MET.MOREOVER, THE PRESENT INSTALLED ELECTRIC POWER GENERATION AND SUPPLY CAPACITY IN BIHAR IS ONLY 1846 MW [APPX]. CONSIDERING EVEN 73% POWER PLANT LOAD FACTOR BIHAR REQUIRES POWER GENERATION INSTALLED CAPACITY OF THE VALUE OF 9000 MW [APPX].THUS ‘THE NEED AND AVAILABILITY’ OF INSTALLED POWER GENERATION GAP IS VERY HIGH. WHICH COMES TO 1: 5 OR  20% POWER AVAILABILITY ONLY.

THE REASON FOR SUCH A POOR ELECTRICITY GENERATION INSTALLED CAPACITY IN BIHAR IS UNAVAILABILITY OF ‘POWER GENERATION BACKING ENERGY SOURCES: WATER FOR HYDROELECTRICITY AND COAL FOR THERMAL ELECTRICITY. NEVER THE LESS, 75% POWER IN BIHAR IS GENERATED OR RECEIVED AS THERMAL ELECTRICITY, 20% AS HYDROELECTRICITY AND 5% ELECTRIC ENERGY IS MADE AVAILABLE FROM ‘REMAINING ENERGY SOURCES’.

AVAILABILITY OF WATER AND COAL SOURCES FOR POWER GENERATION IN BIHAR IS TURNING INTO A REMOTE DREAM AS THESE SOURCES ARE BECOMING MATTER OF GREAT SCARCE. THE R.E.S./ NON-CONVENTIONAL SOURCES IN USE ARE NOT CAPABLE OF MEETING EVEN 5% OF THE PEAK POWER LOAD DEMAND OF THE STATE- BIHAR.

AT PRESENT ‘THE INSTALLED POWER GENERATION CAPACITY AND POWER SUPPLY MANAGEMENT GAP’ TO MEET PEAK POWER LOAD DEMAND IN BIHAR IS OF 600 MW [APPX]. USING OUR ‘’ART OF GEO-ASTRAL 100% CLEAN POWER GENERATION TECHNOLOGY’ WE WOULD LIKE TO PRODUCE GEO-ASTRAL ELECTRICITY AND SUPPLY OVER 3000 MW PER HOUR WITHOUT ANY POWER BACKING - INPUT BUT SYNCHRONIZED WITH 33KV POWER GRID .

SINCE THE PLANT LOAD FACTOR OF OUR GEO-ASTRAL ENERGY TECHNOLOGY IS CLOSED TO 100% FROM THIS OVER 3000 MW POWER REAL EFFECTIVE OUT PUT WILL REMAIN CLOSED TO 100%. HENCE, THIS NATURE OF MEGA POWER GEO-ASTRAL 100% CLEAN ENERGY GENERATION PLANT WILL BE BROUGHT INTO PRACTICE FOR THE FIRST TIME IN THE WORLD, WE ARE TO TAKE IT AS ‘VENTURE PILOT’ PRODUCTION PLANT  AT AN ESTIMATED COST OF Rs 15 (FIFTEEN) CRORES AND ABOVE PER MEGA WATT. ANY NEXT SUCH GEO-ASTRAL 100% CLEAN ELECTRICITY GENERATION PLANT COULD BE MORE ECONOMIC AND HIGHLY COST EFFECTIVE.

FROM THE ABOVE QUANTA OF ELECTRICITY WE ARE INTENDED TO SUPPLY A FEW MW POWER TO THE NEAR BY AREA / VILLAGES ON HIGHLY ECONOMIC RATE FOR THEIR PROSPERITY. ONLY ABOIT 0.6 MW POWER WILL BE USED BY OUR PLANT WORK-SHOP.REMAINING POWER WILL BE EXPORTED TO BIHAR STATE/CENTRAL ELECTRICITY BOARD’S THROUGH THE SAME 33KV POWER GRID. THUS OUR STATE CAN BE GETTING UNINTTEREPTED 100% CLEAN POWER SUPPLY FROM OUR PLANT TO THE VALUE OF REQUIRED MW/ YEAR. THIS POWER SUPPLY TO THE STATE ELECTRICITY BOARD WOULD BE PROVIDED UNDER ‘MERCHANT POWER TRADING SCHEME' OF THE CENTRAL GOVT ELECTRICITY ACTS.

 

 

TECHNOLOGY

 

SINCE THE GEO-ENERGY IS OF MONODIRECTIONAL SINISTERAL FLOW IN NATURE TO THE VALUE OF 8.25 KW PER UNIT OF THE NEGATIVE GRAVITATIONAL ENERGY SOURCE, TO CONVERT IT INTO DEXTRAL DIRECTIONAL FLOW POWER SYNCHRONIZATION OF AC~ NATURE IS REQUIRED. FOR THIS PURPOSE DIRECT 11 Kv AC~ ENERGY POWER FROMTHE 33Kv POWER GRID IS DEPLOYED INTO POWER PRIMING / SYNCHRONIZATION ACTION, THIS QUANTA OF POWER USED FOR POWER PRIMING/SYNCHRONIZATION WOULD BE KEPT ON RETURNING BACK TO THE POWER FEEDERS/GRID.

ONCE AC~ POWER PRIMING /SYNCHRONIZATION IS MADE AVAILABLE MULTIPLE PROVISIONS ARE ENSURED TO ACHIEVE SMOOTH GEO-ASTRAL ENERGY GENERATION BY THE PERPETUAL GEO-ASTRAL POWER GENERATION DEVICE. FOR THIS PURPOSE ASTRAL AND GEO ENERGY COLLECTION NETWORKS ARE INTRODUCED IN 11Kv AC~ POWER LINES, WHERE IN FOR ASTRAL AND GEOENERGY NETWORKS STAR BINDING TRANSFORMER LIKE EQUIPPMENTS ARE USED. WHICH ARE AS FOLLOWS.AC~ DEXTRAL POWER IS ALLOWED TO MULTIPLY WITH SINESTERAL GEO/ASTRAL ENERGY CONFRONTING WITH ITS CONTACT; SINISTERAL POWER REDRESSING BY ‘PRO-ANTI’ MAGNETIC FLUXES FOR POWER FLOW MANUPULATION; SUPPER CONDUCTION IN THE AC~ LOOPS IS INDUCED BY THE VIRTUAL ENERGY EXCITEMENT TO WITH HOLD ENHANCED POWER LOAD; AND THE INITIAL AC~ POWER RESOURCE IS AUGMENTED SEVERAL FOLDS.

MINIMUM FOR SIX HOURS AC~ POWER SYNCHRONIZED AND PRIMED GEO/ASTRAL-GEN-DEVICE WITH ALL ABOVE DESCRIBED PROVISIONS IS ALLOWED TO RUN TO GENERATE AC~ ELECTRICITY OF DESIRED FREQUENCY, VOLTAGE WITH SMOOTHEN PLANT FUNCTION. PERFECTION OF THE GEO/ASTRAL-GEN-DEVICE ASSEBLAGE AND QUALITY POWER OUT PUT IS REVERIFIED AND REENSURED.EARTHING / GROUNDING, INSULATION, SATISFACTORY FUNCTIONING OF JOINTS, SWITCHES AND ALL KINDS OF OPERATIONAL SAFTY MEASURES ARE REENSURED. ONCE THE AC~ POWER OF 11Kv AND 50 Hz IN A POLLUTION CONTROLLED SURROUNDINGS HAS TO COME INTO PROPER ACTION, GRADUALLY POWER LOAD IS DEPLOYED UPON AT 440 VOLT THROUGH 11000 VOLT NET WORKS.THIS IS OF VERY COSTLY AND HIGHLY SKILLED WORK-PERFORMANCE. ONCE EVERY THING, AS DESCRIBED ABOVE, IS PROPERLY AVAILABLE THE POWER SUPPLY SYSTEM IS ALLOWED TO BE VERIFIED BY THE POWER PROCURING AGENCY, AND AFTER GETTING NOC /NO OBJECTION CERTIFICATES THE POWER SUPPLY/EXPORTING SERVICES ARE BROUGHT INTO ACTION FOR DISTRIBUTION AND PUBLIC CONSUMPTION.

NUMEROUS TRANSFORMER LIKE HEAVY DUTY STRUCTURES ARE CONSTITUENT PARTS OF THE PERPETUAL GEO/ASTRAL-GEN-DEVICE. THEY ARE WELL INSULATED THICK FIBRE SHEET COVERED DRIED AIR/OIL COOLED DEVICES OF DIFFERENT SPECIFICATIONS HEAVY DUTY IDENTITIES. SUCH PERPETUAL GEO/ASTRAL-GEN-POT/DEVICE INSTALLED IN A WAY AND MODE TO HAVE MAXIMUM VIVRATION FREE ERECTION ON HEAVILY STRONG INSULATED CIVIL STRUCTURES.FURTHER THE GEO/ASTRAL-GENENERATION DEVICE IS ATTACHED DIRECTLY TO 33000 VOLT OIL COOLED TRANSFORMERS BY WELL KNOWN TECHNOLOGY. THE NEAR BY SUBRURAL POPULATION/ RURAL MASSES AND THE PLANT WORK-SHOP GET POWER AT 440 VOLT CONVERTED FROM 11000 VOLT SYNCHRONIZATION NETWORKS. SUCH POWER GENERATION PLANTS SHOULD NOT BE OF SMALL POWER GENERATION CAPACITY, SAY 100 TO 150 MW.

 

DEVICES AND IMPLIMENTS

 

TWO SETS (POWER SYNCHRONIZATION SET AND POWER AUGMENTATION SET) THREE GROUPS OF HEAVY DUTY FUNCTIONING ‘DEVICES AND IMPLIMENTS’ ARE DEPLOYED TO GENERATE DESIRED QUALITY AND QUANTUM OF GEO/ASTRAL AC~ ELECTRICITY. THEY CONSIST OF A] POWER PRIMING /SYNCHRONIZING DEVICES AND IMPLIMENTS  B] GEO/ASTRAL-GEN-POT DEVICES AND IMPLIMENTS, AND C] HIGH VOLTAGE AC~ ELECTRIC ENERGY EXPORTING DEVICES AND IMPLIMENTS FOR ATTACHING TO 33kv POWER GRID/DISTRIBUTION NET WORKS.

THE POWER PRIMING /SYNCHRONIZATION DEVICES AND IMPLIMENTS IN ANY ISOLATED PROJECT ARE PERPETUALGEO- POWER GENERATION PLANT. INSTALLATION, AND DEMO RUNNING AT PRESCRIBED POWER LOAD ON TURN-KEY BASIS WORK WILL BE PROVIDED BY THE EQUIPMENT MANUFACTURES AND SUPPLYERS. –’

 

IF BSEB PERMITS 5 TO 10 TIMES AUGMENTATION OF POWER CAN BE MADE DIRECTLY UPON ITS 11kv/440VOLT POWER DISTRIBUTION GRID. HENCE, SUCH GEOGENERATION POWER UNITS, WHICH GENERATES AC~POWER IN MW DIRECTLY FROM THE EARTH ARE SUITABLE ALSO FOR POWER TO BE EXPORTED AWAY & AHEAD FROM THE FEEDER GRID TO ‘END POINT POWER GENERATION AND SUPPLY NET-WORKS’. THIS MODE OF GEO-GEN-SETS ARE HIGHLY CREDITED FOR DISTRIBUTION AND SUPPLY OF POWER AHEAD FROM THE TERMINAL POINT OF THE SEB-POWER GRID WITH ALMOST  WATTLESS POWER EXISTENCE.THUS IT IS VERY SUITABLE FOR SUBRURAL/RURAL/AGRICULTURE NEED BASED POWER SUPPLY.IN ADDITION TO THE ABOVE IT IS ALSO POLLUTION AND CARBON DIOXID EMISSION FREE.  

THE GEO-GEN-POT/DEVICE  IS PROPRIETORY 'DEVICES AND IMPLIMENTS'. THEY ARE MANUFACTURED, SUPPLIED, INSTALLED AND OPERATED ONLY BY THE EXPERTS OF ITS INVENTOR GROUPS. DEPENDING ON AC~ POWER GENERATION QUANTUM CAPACITY, VOLTAGE AND THE FREQUENCY INPUT THE MODIFICATION COST DOES NOT VARY SUBSTANCIALLY AND AT PRESENT THE ESTIMATED COST IS Rs 15.00 [FIFTEEN] CRORES/MW ONLY WITH TURN KEY SERVICES BASIS.

ALL DEVICES AND IMPLIMENTS ARE THOSE USED REGULARLY FOR TRANSPORTING AC~ POWER FROM ONE POINT TO OTHER POINTS. WHICH ARE PROCURED AT MARKET PRICE RATE AS PER REQUIREMENTS FOLLOWING STANDARD TRANSFORMATION TECHNOLOGY APPLICATIONS SUITABLE FOR   POWER IN MWs EXPORTING AT 440 VOLT, 11000 VOLT AND 33000 VOLT ONLY.