INTRODUCTION:
MODERN ELECTRICITY
GENERATION PLANTS ARE ENERGY CONSUMPTION BACKED EITHER OF CONVENTIONAL OR NON-CONVENTIONAL ENERGY SOURCES. WELL KNOWN MEGA
POWER GENERATION PLANTS ARE HYDROELECTRIC, THERMAL AND NUCLEAR. MODERN SOCIETY IS GETTING POWER SUPPLY UNDER CENTRALISED POWER
DISTRIBUTION SYSTEM BASICALLY FROM THESE THREE ENERGY SOURCES. FUTURE OF ALL THESE THREE ENERGY SOURCES ARE NOT VERY MUCH
FAIR. DAYS ARE NOT AWAY WHEN THESE TYPES OF POWER GENERATION PLANTS SHALL BE HAVING ONLY A HISTORICAL STATUS.
PRESENT ERA IS DEMANDING FOR NON-CONVENTIONAL
MEGA POWER GENERATION PLANTS.AMONG MANY OF THEM – SOLAR, WIND, TIDES AND BIOENERGY SOURCES ARE PROMISING. BUT THESE
ARE INCAPABLE OF REPLACING CONVENTIONAL MEGA POWER GENERATION ENERGY SOURCES AS STATED ABOVE. CONCEPTION OF A MEGA POWER GENERATION
PLANT FROMVERY UNPOPULAR NON-CONVENTIONAL SOURCE - GEO ENERGY GENERATION PLANT, HAS NOT YET BEEN CONCEIVED EITHER BY ANY PRIVATE
OR PUBLIC SECTOR.. BUT ITS HISTORY OF AVAILABILITY IN DIFFERENT WAYS AND MODES CAN BE TRACED SINCE 1980 [THE TRIBUNE, CHANDIGARH],
1986 [THE BIO-ENERGY SOCIETY OF INDIA] AND 2005 [IN THE INTERNATIONAL SCIENTIFIC JOURNALS/ MAGAZINES OF ‘ASSOCIATION
OF INTERNATIONAL SCIENTISTS’-AIS].MOREOVER MANY DETAILS AND DESCRIPTIONS ARE ALREADY AVAILABLE ON THE WEBSITES; drmallikaugmentsenergy.tripod.com,
and feacksole.tripod.com, and drmallikkn.tripid.com, drmallikkn.com,
OUT OF PRESENT INDIAN NATIONAL
MINIMUM POWER DEMAND OF ABOVE 212000 MW ONLY 182344 MW INSTALLED ELECTRIC POWER GENERATION CAPACITY IS AVAILABLE. 55% OF WHICH
IS COAL BURNT THERMAL ELECTRICITY. OUT OF WHICH ONLY 58% POWER PRODUCTION IS POSSIBLE TO BE EXPORTED TO THE POWER GRIDS FOR
DISTRIBUTION AND CONSUMPTION. AT PRESENT THE INSTALLED POWER GENERATION CAPACITY AND
POWER SUPPLY MANAGEMENT GAP’ TO MEET PEAK POWER LOAD DEMAND OF THE NATION IS FOR ABOVE 90000 MW [APPX]. USING OUR ‘’ART
OF GEO POWER GENERATION TECHNOLOGY’ WE CAN PRODUCE GEOELECTRICITY AND MEET THE POWER NEED OF ENTIRE NATION WITHOUT LETTING
ANY RECURRENT ‘ENERGY RESOURCE CONSUMPTION BACK-UP’ SAY COAL, WATER OR ATOMIC FUELS.
USING THE GEO-POWER GENERATION SKETCH SHOWN ABOVE FOUR FOLDS ADDITION AC~POWER CAN BE HAD THAN THE POWER PRIMING
SOURCE. WHERE IN THE POWER LOAD RELIEF TO THE PRIMING SOURCE WILL BE 50%, AND THE POWER PRIMING SOURCE WILL BE NOW ABLE TO
WITHSTAND 50% ADDITIONAL(i.e. 1.5 times) POWER LOAD. THUS, TOTAL POWER AVAILABILITY FOR PUBLIC CONSUMPTION WILL BE FIVE FOLDS
IN HAND- FOUR FOLDS THROUGH GEOGENERATED POWER PRODUCING NETWORKS’ AND ONE FOLD WILL FROM REMAINING POWER PRIMING RESOURCE.
THE TECHNICAL DETAILS OF THIS 1+4 MW GEO-POWER GENERATION CAN BE REPRESENTED AS DESCRIBED BELOW- TWO THREE PHASE
TRANSFORMERS OF 440V/11000V CAPABLE OF BEARING 4MW POWER ARE CONNECTED THROUGH THREE SETS OF GEO-GEN-POTS IN BETWEEN 11000V-TERMINALS
AS IN ABOVE SHOWN SKETCH. NOW THE COUPLED TWO SETS OF FOUR MW TRANSFORMERS HAVE GOT ONE SET OF 440V TERMINAL AT BOTH ENDS.
ONE SET OF 440V TERMINALS IS ATTACHED WITH 440V POWER GRID THROGH 1.5 TIMES POWER AUGMENTATION DEVICES. AND THE ANOTHER SET
OF 440V TERMINALS IS USED FOR POWER LOAD GIVING TO THE EXTENT OF 5300 AMPS AT 440V AND 50Hz. ONCE PROPERLY INSTALLED THIS
MUCH POWER IS AVAILABLE AS LONG AS THE PRIMING SOURCE IS HAVING PROPER QUANTUM AND QUALITY OF AC~POWER.
THIS IS A MATTER OF MEASUREMENT THAT THE ONE MW POWER SOURCING POWER GRID ON FULL POWER LOAD DEMONSTRATES ALMOST
1325 AMPS AT 440V AND 50Hz. AFTER HAVING GOT ATTACHED WITH THE GEO-GEN-POT THE POWER PRIMING GRID WOULD NOW STAND POWER LOAD
OF 1968AMPS AT 440V 50Hz. ONLY THIS MUCH POWER LOAD WILL EXERT 1325 AMPS 440V50Hz ENERGY PRESSURE ON THE ONE MW POWER RESOURCING
TRANSFORMER. AT THE SAME TIME WHILE DRAWING 1.5 MW POWER FROM THE ONE MW POWER GRID, WE CAN EASILY DRAW FOUR MW ADDITIONAL
POWER FROM THE GEO-GENERATION TERMINALS. THIS GENERATION OR ABOVE FIVE FOLDS POWER AUGMENTATION IS SUPPOSED TO CONTINUE TILL
THE TIME THE POWER GRID IS ALIVE AND THE [GEO-GEN-POT] EQUIPMENTS ARE SAFE.
THIS TECHNOLOGY IS NOW AVAILABLE FOR PUBLIC SERVICES. IT DEPENDS HOW AND WHERE FOR HOW MUCH
POWER IS AVAILED WITH THIS GEO-POWER-GENERATION DEVICE.
ANOTHER EXAMPLE OF MULTIWAYS CO-POWER INTEGRATION/ GENERATION IS DESCRIBED BELOW:-THIS NATURE
OF CO-POWER GENERATION MAY ALSO BE CALLED 'THE SYNPYROL GROUND/GEO-MEGA POWER GENERATION PLANT. HERE, THE SYNPYROL GROUND
ENERGY MEANS GENERATION OF TWO PHASE AC~ELECTRICITY OF 240 VOLT 50 Hz FROM THE GROUND/EARTH, AND USE IT FOR CONVERSION INTO
THE SYNPYROL INTERNAL COMBUSTION GASEOUS FUEL TO SUBSTITUTE NATURAL HYDROCARBON LIQUID FUEL/DIESEL TO ITS MAXIMUM SHARE -
80%. HERE THE ENERGY GENERATION IS BASED ON THE 'BIHSRI-SIR' SCIENCE AND TECHNOLOGY USING AC~ELECTRICITY FOR POWER PRIMING
RESOURCE. THE PREPRIMED PERPETUAL POWER GENERATION DEVICE OF THE 'BIHARI-SIR' TECHNOLOGY IS USED TO GENERATE ABOUT 30 UNITS
(KVA) AC~POWER OF 240 VOLT 50Hz. THIS POWER IS DEPLOYED TO THE SYNPYROL REACTION CHAMBER TO GENERATE GASEOUS HYDROCARBON FUEL,
AND THE AC~POWER RETRIVED FROM THE REACTION CHAMBER IS ADDED BACK TO IT.THE SYNPYROL REACTION CHAMBER IS ALSO BASED ON THE
'BIHARI - SIR' SCIENCE AND TECHNOLOGY. IN THIS CHAMBER WATER IS SYNTHESISED WITH ACTIVELY CHARGED CARBON PARTICLES, AND THE
PRODUCES ARE BROKEN DOWN INTO SEVERAL USEFUL GASEOUS FUELS. THE CHEMICAL REACTIONS ARE PRESUMED TO TAKE PLACE ARE AS NOTED
AHEAD: X(42 H2O + 29 C ) + CAT N = X C3 H8 + X C3 H7 OH + X C2 H5 OH + X C2 H6 + X C2 H2 + X CH3 OH +X CH4 + X HCO OH + X
H2 O2 + 14X CO +21X H2 O.............. AS RAW MATERIAL WATER IS TAKEN FROM THE GROUND, AC~ ELECTRICITY IS TAKEN FROM THE GROUND,
AND THE CARBON RESOURCES- GRAPHITE AND HIGH CARBON PARTICLES ENRICHED BURNT ENGINE LUBRICATING OIL ARE TAKEN AS INDUSTRIAL
WASTES FOR UTILIZATION. INTERNAL COMBUSTION DUAL FUEL DRIVEN DG-SET IS USED FOR AC~THREE PHASE POWER PRODUCTION, AND THERE
AFTER ITS POWER MULTIPLICATION PROCEDURES ARE APPLIED. MOSTLY 0.5 MW DIESEL OPERATED DG-SET IS USED FOR THIS PURPOSE. THE
FUEL FEEDING SYSTEM OF SUCH GEN-SET IS MODIFIED, WHICH ENABLES IT TO WORK ON DIESEL COMBINED WITH THE SYNPYROL GASEOUS FUEL.
SUCH A MODIFIED DUAL FUEL RUN DG-SET PRODUCES FULL POWER ON FUEL INTAKE OF 750000 K.CAL/Hr. THIS MUCH EXTERNAL ENERGY IS PROVIDED
TO THIS MODIFIED DG-SET FROM THE COMBINATION OF FOLLOWING INGREDIENTS: 20 LTRS/Hr BIO OR NATURAL DIESEL, 38 Kg/Hr THE SYNPYROL
FUEL, 5000 UNITS/500 Hr THE SYNPYROL CONCENTRSTE-FEACKSOLE. THE ANNUAL REQUIREMENTS IN THESE ABOVE NOTED FUELIC INGREDIENTS
WOULD BE AS FOLLOW:- BIO/NATURAL DIESEL 175700 LTRS, THE SYNPYROL GASEOUS FUEL 333800Kg, THE SYNPYROL CONCENTRATE FEACKSOLE
88000UNITS. APART FROM THESE THERE WOULD BE INPUT UTILITIES OF - GEO WATER 334000 LTRS, ACTIVATED CARBONS 167000Kg, GEO-AC~
ELECTRICITY 264 MW/YEAR. THIS COMBINATION OF FUEL FEEDING DRASTICALLY REDUCES EXHAUST AND NOISE POLLUTIONS AND KEEPS THE ENGINE
COMPARATIVELY COOL. ON EXPENSE OF THIS EXTERNAL ENERGY RESOURCES THE DG-SET WOULD KEEP ON GENERATING 500 KVA THREE PHASE AC~
50Hz 440 VOLT ELECTRICITY PER HOUR. NOW USING APPROACHES OF THE 'BIHSRI-SIR' TECHNOLOGY THE ELECTRIC ENERGY IS AUGMENTATED
FROM 0.5 MW TO 1296 MW 440 VOLT 50Hz. AND THIS IS TO BE DITECTLY DISTRIBUTED TO THE PUBLIC CONSUMERS.
BASED ON OUR TECHNOLOGY IF THIS RESOURCE
OF POWER IS TO BE FED TO THE 33KV POWER GRID THE SOURCE CAN BE FURTHER AUGMENTATED SIX TIMES TO THE VALUE OF 7776 MW. THROUGH
THIS 33 KV POWER GRID OUR ENERGY SO PRODUCED WOULD BE AVAILABLE FOR THE MASS PUBLIC CONSUMPTION.
THE POWER AUGMENTATION/MULTIPLICATION NET
WORKS ARE COMPLEX AND COMBURSOME. THERE FORE INSTALLATION AND MAN POWER TRAINING MUST BE PREPERFORMED STEP WISE AND ON A PILOT
PLANT ONLY. THIS NEEDS TO ENCOUNTER GREAT FINANCIAL AND TECHNICAL RISK, WHICH CAN NOT BE SUCCESSFULLY INTERTAINED WITHOUT
WELL TRAINED AND HIGHLY WORK EXPERIENCED PERSONNALS.THIS PLANT MAY NEED 1000ACRES OF SUITABLE LAND WITH INFRASTRUCTURES REQUIRED
USUALLY FOR ABOVE 1000 MW POWER GENERATION THERMAL ELECTRIC PLANTS. THUS THE PREOPERATIVE /OPERATIVE INSTALLATION CUM TRIAL
RUNNING AND POST OPERATIVE COST WILL BE HIGHER FOR THE PILOT PLANT THAN THE STANDARD WORKING PLANTS.
IT IS TO BE MADE CLEAR
THAT THE ABOVE DESCRIPTION IS NOT ANY HYPOTHETICAL. DURING 1984-85 Yr ON REQUEST OF THE THEN TECHNICAL MEMBER OF THE BSEB
A PILOT PLANT OF ABOVE 10 MW GENERATION CAPACITY WAS DEVELOPED FOR RURAL ELECTRIFICATION. BUT DUE TO RED TAPPISM IT COULD
NOT GO AHEAD !
THE TECHNOLOGY TRANSFER WOULD BE MADE ON NON-EXCLUSSIVE BASIS WITH LUMPSOME, RECURRENT AND SHARE ROYALTY BASIS. THIS
WOULD BE FOLLOWED WITH BY NON-DISCLOSER AGREEMENTS WITHOUT ANY PATENT/TECHNICAL KNOW HOW DISCLOSER!!!